GoI
Project Management & Monitoring System
Government of India · PMRS v4.2
EN
हिन्दी
ગુજરાતી
Department
All Departments
User (Simulate)
Home
Work Orders
Generate
Generate Work Order
Back to Work Orders
Section 1 — Work Order Reference
Work Order Number
*
Letter of Acceptance No.
Agreement No.
Agreement Date
Work Order Type
*
-- Select --
Turnkey Construction
Variation Order
Extra Item
Deviation
Emergency
Priority
*
-- Select --
Low
Medium
High
Critical
Section 2 — Linked Project & Tender
Project (Select to Auto-Fill Data)
*
-- Select --
Engineer-in-Charge / Nodal Officer
-- Select --
Sh. Rajesh Kumar (EE)
Smt. Anita Sharma (SDO)
Sh. Vikram Singh (XEN)
Dr. Priya Menon (Director)
Sh. Arun Pillai (AE)
Smt. Kavita Rao (Commissioner)
Sh. Mohan Lal (SE)
Sh. Sanjay Verma (PD)
Smt. Meena Nair (DS)
Sh. Ramesh Chand (EE)
Section 3 — Awarded Vendor
Awarded Contractor (L1 Winner)
*
-- Select --
Larsen Infra Pvt Ltd
Shapoorji Constructions
Hindustan Civil Works
Bharat Engineering Co
Megha Infraprojects
NCC Limited
GR Infraprojects
KEC International
Ashoka Buildcon
PNC Infratech
Dilip Buildcon
Sadbhav Engineering
Tata Projects Ltd
IRB Infrastructure
Patel Engineering
Vendor License Class
GSTIN / PAN Registration
Section 4 — Financial & Securities
Awarded Contract Value (₹ Lakhs)
*
Earnest Money Deposit EMD (2%)
Performance Bank Guarantee PBG (5%)
PBG Bank Guarantee Ref No.
Issuing Bank Name
Defect Liability Period (months)
Section 5 — Timeline
Date of Issue
*
Stipulated Date of Completion
*
Liquidated Damages (0.5%/week)
-- Select --
Applicable (Max 10%)
Not Applicable
Section 6 — Turnkey Scope of Work
Scope of Work (as per contract agreement)
Special Government Conditions
System Information (Auto-filled)
All timestamp fields are managed by the system and cannot be edited.
Reference No.
Auto-generated on save
Created By
Sh. R. K. Sharma
Created On
2026-06-09 09:42:18 IST
Last Modified By
—
Last Modified On
—
Record Status
New / Unsaved
Cancel
Save as Draft
Issue Work Order